Is more needed to protect migratory birds as N.S. expands land-based wind farms? - Action News
Home WebMail Thursday, November 21, 2024, 10:52 PM | Calgary | -10.9°C | Regions Advertise Login | Our platform is in maintenance mode. Some URLs may not be available. |
Nova Scotia

Is more needed to protect migratory birds as N.S. expands land-based wind farms?

With Nova Scotia going all in on land-based wind farms to reduce reliance on burning fossil fuels, there are calls to do more to protect migrating birds from the spinning blades.

Nova Scotia Bird Society raises concern with Wedgeport-area wind farm set to start operating next year

a man wearing outdoor apparel and binoculars around his neck stands in front of wind turbine in the woods. There is also a piece of heavy equipment in the background.
Nova Scotia Bird Society president Tony Millard would like to see collision mitigation in place at wind farms to protect the many birds that migrate to and from coastal areas of the province. (Paul Withers/CBC)

With Nova Scotia going all in on land-based wind farms to reduce reliance on burning fossil fuels for electricity, there are calls to do more to protect migrating birds from the spinning blades.

"We're talking billions of birds over the years funnelling on what they call the Atlantic Flyway. And we're putting more and more hazards in the way with these wind farms," said Tony Millard, president of the Nova Scotia BirdSociety.

Millard is urging the province to require a range of measures including manufacturing blades in a colour other than white to help differentiate background, emitting frequencies to warn birds away, andusing radar that would shut down wind farms if flocks approach.

Why Wedgeport Wind is under scrutiny

The project drawing the most scrutiny from regulators and advocates like Millard is a 13-tower, 80-megawatt wind farm approved for Comeaus Hill near Wedgeport in southwestern Nova Scotia. It is set to begin generating power late next year.

The wind farm is in the flight path of migrating birds crossing the Gulf of Maineandlocated between a nesting site for endangered roseate terns and a wildlife sanctuary.

"Wedgeport is particularly important for birds, and it poses very serious dangers," said John Kearney, anenvironmental researcher and industry consultant who tracks birds.

Wedgeport Wind is being developed by Elemental Energy of Vancouver in partnership with Stevens Wind and the Sipekne'katikFirst Nation.

Environment and Climate Change Canada has said it islikely the project willaffect migratory birds, but there isinsufficient information to assess the impact.

Developer must have management plan

The Nova Scotia governmentapproved the projectayear ago with a condition requiring developers to create an "adaptive management plan" with new mitigation measures and additional monitoring should the project harm resident and migratory birds and bats.

Wedgeport Wind is one of five onshore wind farms selected by the province to help meet its commitment that 80 per cent of electricity must come from renewable sources by 2030 when all of Nova Scotia Power'scoal plants must close.

Kearney said putting protections in place for migratory birdsincluding radar, as Millard suggestedshould be considered best practice in the industry.

A man wearing outdoor apparel examines a survey stake in a field
Industry consultant John Kearney says radar that shuts down wind turbine blades when flocks approach is needed to protect migrating birds. He's optimistic the developer of the Wedgeport wind farm is taking the issue seriously. (Pat Callaghan/CBC)

"When you add up all the money that it costs to build a wind farm, all the potential money that can be made from a wind farm, this is just a normal cost of doing business," he said.

Elemental Energy declined an interview, but in a response to CBC News, the company said it has met the terms of the approval issued by the Nova Scotia Department of Environment and Climate Change.

That included a second year of bird and bat studies in 2023 and a wildlife management plan to ensure the wind farm meets the federal Migratory Birds Convention Act.

Its adaptive management plan has yet to be filed.

"While we have not made any commitments to bird deterrents or other mitigation measures noted by John Kearney, these measures will be considered should monitoring results demonstrate that there is an adverse effect to birds and bats associated with wind turbine operations," said Daniel Eaton, director of project development with Elemental.

Bird mortality studies

Kearney said the commitment leaves him optimistic, but he takes issue with Elemental Energy's prediction that its Wedgeportwind farm will kill a maximum 36 birds a year, saying the modelling is flawed.

Kearney carried out two-year bird mortality studies on a pair ofNova Scotia Power-owned wind farms: Digby Neck and NuttbyMountain.

The utility released both to CBC News upon request.

At the 20-turbine Digby Neck wind farm, an estimated 286 birds were killed in the first year of operation in 2011, but theestimate plummeted to 29 when the lighting was extinguished. According to the study, it was believed lights may have attracted birds at night.

A dead bird rests on a plastic bag
At Digby Neck an estimated 286 birds died during the first year of operation. The number of deaths plummeted the next year after lighting at the site was turned off. (Nova Scotia Power )

At the 22-turbine Nuttby Mountain wind farm in Colchester County, an estimated 76 birds died annually, based on an average of 3.47 per turbine, per year below the Canadian average of 4.6 birds per turbine, per year.

Kearney saidwind farms on south-facing peninsulas like Digby Neck and Wedgeport pose the greatest threat.

"My experience doing research on migration is that you can have huge numbers of birds on any particular morning. Not every morning, not most of the mornings, but on enough mornings that's going to happen a few times a year, that there's going to be tremendous numbers of birds going up those peninsulas. So what you don't want in that situation is a wind turbine."

Developer cleared forsite prep

Nova Scotia's Department ofEnvironment and Climate Change said the Wedgeport project is in good standing.

"The proponent has completed requirements necessary to begin site preparation and there are no issues with non-compliance or outstanding items associated with their environmental assessment. Other requirements remain in progress," spokesperson Kristin Matthews said in a statement to CBC News.

The top of a wind turbine is seen with blue sky and clouds in the background.
Wind turbines are not the biggest killer of birds, according to a 2017 estimate from the U.S. Fish and Wildlife Service. Cats were estimated to kill 2.4 billion birds annually, while birds striking glass buildings, vehicles and electrical lines are all estimated to kill tens of millions per year in the U.S. (Matt Duguid/CBC)

Last month, Environment Minister Tim Halman thanked Millard for bringing his concerns forward.

Millardsaid in an interview the province has an opportunity to make a difference as it embraces clean energy and more wind turbines.

"We accept they're coming," he said. "We're trying to get collision mitigation in place so we can become world leaders in reducing the deaths of these birds."