New Champlain Bridge could use ultra-high performance concrete - Action News
Home WebMail Saturday, November 23, 2024, 01:44 AM | Calgary | -11.7°C | Regions Advertise Login | Our platform is in maintenance mode. Some URLs may not be available. |
Montreal

New Champlain Bridge could use ultra-high performance concrete

The consortium behind the new Champlain Bridge says it's considering the use of a new ultra-high performance concrete for certain parts of the bridge.

Infrastructure Canada says normal concrete can corrode in 15 years, ultra-high performance lasts for 70 years

The design for the replacement bridge for Champlain Bridge is shown in an artist's rendering released on May 31, 2014 in Montreal. Minister Denis Lebel has put en end to speculation that a new Montreal bridge would be named after hockey great Maurice Richard. (Canadian Press/Handout)

The consortium behindthe new Champlain Bridge project isconsideringthe use of anewultra-high performance concrete (UHPC)for some parts of the bridge.

"We'relooking at a selective, precise application of this ultra-high performance concrete for the surface of the bridge and also for the joints," saidDanielGenest,withthe Signature on the Saint-Laurentconsortium.

Ultra-high performance concrete contains small steel fibres, which are supposed to help slow corrosion. (Radio-Canada)

Ultra-high performance concrete (UHPC) contains small steel fibres, which are supposed to help slow the development of cracks and, as a result, corrosion caused by traffic and temperature changes.

Genest said UHPCcomes with certain risks if it's used without discretionbecause it's relatively untested in Canada.

"There's always danger introducing a new technology into a high-risk project like the new ChamplainBridge," he said.

"There hasn't been widespread use [ofUHPC] in Canada yet."

It will take up to 70-80 years for salt and waterto reach the steel and corrosion to start,whereas with normal concrete, the salt could reach the steel after 15 years.- ZoubirLounis, Concrete structures group at the National Research Council of Canada

The more tried and true high-performance concrete will still be used for the majority of the bridge.

Some engineers in Montreal told Radio-Canada this week that the new, UHPCconcrete would be a better choice for the entire bridge given its durability.

National Research Council touts benefits of UHPC

A 2010 report published on the National Research Council of Canada's websiteoutlinesthe benefits of high and ultra-high performance concrete.

"It will take up to 70 -80 years for salt and water to reach the steel and corrosion to start,whereas with normal concrete, the salt could reach the steel after 15 years," statedZoubirLounis, leader of the concrete structures group at the NRC Institute for Research in Construction, in the article.

Infrastructure Canada does require construction on the bridgeto use a minimum ofhigh performance concrete.

Anything beyond that is left to the discretion of the consortium.