Pedestrian bridge over new Turcot Interchange will be built after all - Action News
Home WebMail Tuesday, November 26, 2024, 06:15 AM | Calgary | -17.5°C | Regions Advertise Login | Our platform is in maintenance mode. Some URLs may not be available. |
Montreal

Pedestrian bridge over new Turcot Interchange will be built after all

The City of Montreal wants to spend $125,000 on a feasibility study for the project, which will be discussed at a city council meeting Monday.

Consultations on bike and pedestrian bridge should begin soon, says Quebec transport minister

architectural drawing of modern bridge over highway
The Quebec Transport Ministry provided this mock-up of the overpass in 2010. At the time, it was supposed to serve as a bike path, pedestrian walkway and park. (Quebec Transport Ministry)

QuebecTransport Minister AndrFortin says a green walkway over the TurcotInterchange will be built, after the project was axed a number of times.

Fortin says he has been in talks with Montreal Mayor Valrie Plante,andconsultations on the bike and pedestrian bridge should begin soon.

"We're in the process of launching that consultation to really involve the citizens and make sure that that infrastructure can be something that Montrealers, yes, use to commute back and forth, but also that they can really be proud of," he told CBC Montreal's Daybreak.

The City of Montreal wants to spend $125,000 on a feasibility study for the project, which will be discussed at a city council meeting Monday.

The overpasswas part of a plan presented in 2010 for the new highway, but under the tenure of six different transport ministers inthe intervening years, the idea disappeared, reappeared and then vanished again.

The project's rocky road

The walkway, known as theDalle-Parc, would connect the Notre-Dame-de-Grce, Ville-mard and LaSalle neighbourhoods.

It was conceivedas a way to provide residents with a way to cross the highway, but also to address their concerns about traffic and pollution.

When the project was last excluded from the blueprints, some residents said they felt as though they had beenduped that the bridge was only included so they would support the projectand was taken out of the contract after their support had been won.

The previous administration at city hall had been trying to bring the walkway, or a version of it, back.

Not long after her election, Plante said she, too, was in talks with the Transport Ministry about the project.

At that time, Fortin said he would think about reviving the idea, but only after construction of the interchange was finished.

With files from CBC Montreal's Daybreak