City flood prevention program could cost $2.4B over 100 years - Action News
Home WebMail Sunday, November 24, 2024, 06:41 AM | Calgary | -12.4°C | Regions Advertise Login | Our platform is in maintenance mode. Some URLs may not be available. |
Edmonton

City flood prevention program could cost $2.4B over 100 years

Edmonton may have to pay around $2.4 billion to provide adequate flood protection in at-risk neighbourhoods and industrial areas over the next 100 years, according to the latest city report.

A city report says an investment of up to $50 million per year is needed to prevent future flooding

Heavy rain caused flooding at St. Albert Trail and the Yellowhead on Tuesday afternoon in June 2013. (Phil Laplante Jr./CBC News)

Edmonton may have to pay $2.4 billion to provide adequate flood protection in at-risk neighbourhoods and other areas over the next 100 years, according to the latest city report.

The city-wide proposed flood mitigation program which includes installing major drainage systems such as storage ponds in more mature neighbourhoods will cost up to $50 million per year for the next 50 to 100 years.

Chris Ward, the branch manager for the citys drainage services department, says they will ask city council to apply for provincial and federal grants to help alleviate the costs of implementing the flood prevention program.

However, taxpayers will also have to help with the costs, and could see their monthly drainage utility billincrease by a dollar per year or a jump of two to three per cent every year for the foreseeable future.

The flood prevention program, as well asthe increases to drainage utility costs, would be implemented in 2019.

Ward said the update of flood mitigation workis necessary andnot only because of climate change.

Theres an expectation of a much better level of service now, so we have to adapt the neighbourhoods for that, as well as this significant change in storms that were receiving now, Ward said.

Its very much a change in expectations.

City-wide program

Edmonton has previously experienced severe storms where heavy rains caused significant flooding, rising water levels and sewage back-ups, particularly in the citys older areas.

However, the proposed program is not limited to the mature neighbourhoods that have become accustomed to frequent flooding during storms with heavy rainfall.
Chris Ward, branch manager for the drainage services department, says expectations for flooding prevention have changed in recent years. (CBC)

Its any neighbourhood, whichever decade it was built in, which doesnt have a current flood prevention works, Ward said.

If you were to go into the newest neighbourhood which was recently constructed, you will see it is designed very differently to control larger storm events. Any neighbourhood that does not have that type of facility is on the list.

Priority neighbourhoods

Ward said flood prevention workwill vary from neighbourhood to neighbourhoodand will be specific to each areas needs.

Although priority areas have not yet been determined, Ward said previous flooding will be taken into consideration.

We are undertaking works right now which have flooded and we are responding to those and we have built into our plan those works, Ward said.

We will be figuring out or determining a prioritization for all future neighbourhoodsand flooding history will be a part of that prioritization.

The city said the proposed utility bill hikewould not only cover the proposed flood mitigation program, but the entire drainage services department.

The report will be discussed by the City Council utility committee on Sept. 18.