Deerfoot Trail lane expansion opens, connection to Beddington Trail/11th Street is next - Action News
Home WebMail Friday, November 22, 2024, 04:08 PM | Calgary | -10.8°C | Regions Advertise Login | Our platform is in maintenance mode. Some URLs may not be available. |
Calgary

Deerfoot Trail lane expansion opens, connection to Beddington Trail/11th Street is next

Work on a stretch of Deerfoot Trail from Beddington Trail N.W. to Airport Trail N.E. is now complete, easing congestion on the road and simplifying access to the Calgary airport, the province says.

Officials say improvements will ease congestion, simplify access to Calgary airport

Construction trucks and equipment work between the road.
Work on a stretch of Deerfoot Trail from Beddington Trail to Airport Trail is now complete, easing congestion on the busy freeway, says the province. (Google Maps)

Work on a stretch of Deerfoot Trail from Beddington Trail N.W. to Airport Trail N.E. is now complete, easing congestion on the road and simplifying access to the Calgary airport, the province says.

The construction connected11th Street N.E. to westbound Beddington Trail N.W. and northbound Deerfoot Trail, which opens Saturday.

Afourth lane was added to Deerfoot in each direction between Beddington and Airports trails.

President and CEO ofthe Calgary Airport Authority, Chris Dinsdale, said Friday the completed work marksan exciting milestone for the airport.

"These improvementswill enhance and reduce traffic congestion for those heading to YYC," Dinsdale said.

"The additional alternative routes provide much needed flexibility and connectivity to our commercial partners making the airport more accessible from different parts of the surrounding region."

Minister of Transportation andEconomic Corridors Devin Dreeshenthanked contractors for their work onDeerfoot and thankedCalgariansfor their patience during construction.

"Now we can finally see thefruits of all that work and all that labour," Dreeshen said Friday at the news conference, adding the province invested about $700 million into enhancing the road.

Work on upgrading several parts of the major freeway started in 2022, with this leg of construction being the second key segment to be completed,the province said. The first was work on Deerfoot Trail and 64th Avenue N.E., which finished last year.

Coun. Andre Chabot also thanked nearby residents and motorists for bearing with construction workin the area.

"It's short-term pain for the ultimate long-term gain," said the Ward 10 councillor.

Improvements to Deerfoot includeincreased capacity on ramps, additional lanes, reconfiguring exits and intersections and the creation of a second bridge adjacent to the Ivor Strong Bridge.

The work isbeing tackled as separate projects, with the province saying it'sprioritizing the most congested areas first. Itestimatesthat all enhancements to the north-south routewill be complete by fall 2027.

A map of Deerfoot Trail detailing the location of improvements to the road
Work connected11th Street N.E. to westbound Beddington Trail N.W. and northbound Deerfoot Trail as well asaddeda fourth lane to the Deerfoot in each direction between Beddington and Airports trails. (Government of Alberta)

Improvement work includes:

  • Connecting 11th Street N.E., westbound Beddington Trail N.E. and northbound Deerfoot Trail N.E., now completed.
  • A northbound auxiliary lane between 64th Avenue N.E. and McKnight Boulevard N.E.andnew ramps, finishedin 2023.
  • Reconfiguring the interchange at McKnight Boulevard N.E., to finish in summer 2025.
  • New ramps at16th Avenue N.E., to open in fall2025.
  • A northbound bridge and ramps over Glenmore Trail S.E.,to be done in 2026.
  • Reconfiguring the interchange at Southland Drive S.E., to be completedin2026.
  • Work onthe southern portionof Deerfoot Trail aroundBow Bottom Trail andAnderson Road S.E., including steel piling for new bridges, scheduled for2027.
  • Twinning Ivor Strong Bridge, to be done in 2027.

When all of the work is done, motorists on Deerfoot can expect their morning rush hour commutes to be about 15 per cent faster and their evening rush hour commutes to be about 22 per cent faster, the province said.

Coun. Evan Spencer told CBC News his constituents welcome improvements to Deerfoot Trail.

"The road is a mainstay in the commute of most of the ward," the Ward 12 councillor said.

"Obviously, Stoney Trail has helped provide other options, and with opening of the Ring Roadthere are other ways to get to other parts of the city. But the condition of Deerfoot is the condition of the commute for many, many residents in southeast Calgary."

Spencer said he'shad conversations with plenty of residents aboutthe overduework that's happening along Deerfoot.

"The general sentiment I come across is people are excited that this work is happening and that at some point we are hopefully going to have a smoother commute," he said.

Spencer added the importance of these road upgrades are highlighted by the fact that the Green Line LRT continuesto hit snags on its path to construction.

"We are not going to have a Green Line in two years, so the quickest way to improvements on those commutes is definitely theDeerfoot upgrades," he said.